As CSP Focus reported earlier at the end of last month, CGN Delingha 50MW parabolic trough concentrated solar power (CSP) plant, China first large-scale commercial CSP project, was successfully connected to the grid in the evening of June 30.
The success of this project is absolutely a great milestone for China CSP industry, which entitled China the 8th country in the world owning large-scale commercial CSP project.

The project officially broke ground in July 2014, and selected as one of China 1st Batch of CSP pilot projects in September 2016. The project is progressed much faster than other pilot CSP ones.

Free Report: CGN Delingha 50MW Parabolic Trough CSP Plant

Take a look on the development and progress:

● June 30, 2018,connected to the grid
● December 2017, HTF Island started operation
● November 2017, 90% of solar field completed
● September 2017, turbine generator rotor hoisted into position
● August 31, 2017, factory was successful in receiving electricity
● June 29, 2016, the main transformer was installed in place
● April 2016, HTF & TES started construction
● July 2014, broke ground officially
● February 2013, approved by the local Qinghai Province government
● July 13, 2012, signed MoU with Asian Development Bank on CSP project

http://www.cspfocus.cn/ueditor/net/upload/2018-01-18/15380f01-d53d-4944-8c71-fe7fa6f43d27.jpg

More details on the project, please visit:

CSP Focus database: CGN Delingha 50MW Thermal Oil Parabolic Trough project

Chinese companies Beijing Shouhang  IHW Energy Saving & SEPCOII and Shandong Sunway  Petrochemical Engineering Co., Ltd joined the project as EPCs of solar field and HTF&TES respectively. Other local involvers include Dongfang Turbine, Harbin Turbine, Wuxi Chemical Equipment,Co., Ltd etc. And global leading CSP companies like TSK, IDOM, sbp, Rioglass, Solutia, Sulzer also provided components and services for CGN Delingha CSP project.

And you are welcome to join the upcoming CSP Focus Innovatoin 2018(Oct.25-26, China)conference, where you may get more fresh news on the project and technological innovations on CSP system and key components.

Project Schedule

● June 30, 2018,connected to the grid

● December 2017, HTF Island started operation

● December 2017, entering heat transfer oil injection phase and turbine low pressure casingsuccessfully capped

● November 2017, 90% of solar fieldcompleted

● September 2017, turbine generator rotorhoisted into position

● August 31, 2017, factory was successfulin receiving electricity

● June 29, 2016, the main transformer wasinstalled in place

● April 2016, HTF & TES startedconstruction

● July 2014, broke ground officially

● February 2013, approved by the localQinghai Province government

● July 13, 2012, signed MoU withAsian Development Bank on CSP project

● April 2012, CGN solar energy establishedthe experimental base of CSP technology

Full report on this project view online

 Project Overview

CGN Solar Delingha 50MW parabolic trough CSP plant is among China 1st batch of 20 pilot CSP projects and leading the construction progress. With total investment of RMB 1.938 billion, the project is equipped with 9 hours molten salt thermal energy storage. Once completed, CGN Solar Delingha 50MW parabolic trough CSPplant will be the first commercial parabolic trough project, and the first operational pilot CSP project in China.

Basic information
Location West exit solar energy industrial parks, Delingha, Qinghai province
Occupied area 2.5 km2
Investment 1.94 billion RMB
Life cycle 25 years
Natural gas consumption 9%
Heat transfer fluid type High temperature heat transfer boiler
Thermal enery storage Molten salt,9h
Thermal enery storage mode mixed nitrate
Collector technology Euro Trough 150
# of Loops 190
Per loop length 600 m
Annual generating capacity 225 million kwh
Annual water consumption 800,000 ton(water cooling)
Project Participants
Tendering Item Bidding Winner
Basic  Engineering Ingeteam-TSK  Energy Solution
Solar Field  Detailed Engineering TSK Energy  Solution
Technology  Provider for Euro Trough Schlaich  Bergermann Partner
Feasibility  Study NWEPDI  Northwest Electric Power Design Institute
Owner’s  Engineer Aries-AF  Consult
Solar Field  EPC Beijing  Shouhang IHW Resources Saving Technology Company Ltd & SEPCOII  Electric Power Construction No.2  Engineering Company
HTF & TES  EPC Shandong Sunway  Petrochemical Engineering Share Co., Ltd.
Power Block  EPC NWEPDI-Northwest  Electric Power Design Institute Co., Ltd. of China Power Engineering  Consulting Group
Steam Turbine DONGFANG  TURBINE CO., LTD.
Electric  Generator Dongfang  Electric Machinery Co., Ltd
Steam  Generation System Harbin Turbine  Company Limited
DCS ABB
Reflector  & Receiver Tube Rioglass
Hydraulics  System Telijia  (Tianjin) Wnd Power Equipment Components Co., Ltd.
HTF-Synthetic  Oil Solutia  Therminol Co., Ltd., Suzhou
Molten  Salt-Sodium Nitrate Sinkiang  Nitrate Minerals Co., Ltd.
Molten  Salt-Potassium Nitrate Wentong  Potassium Salt Group Co., Ltd.
HTF Pump  & Molten Salt Pump Sulzer (Ensival  Moret)
Globe Valves Flowserve
Oil-Water  Heat Exchanger Harbin Turbine  Company Limited
Oil-Salt Heat  Exchanger WCE-Wuxi  Chemical Equipment Co., Ltd
Steam  Separator Harbin Boiler  Co., Ltd.