Elecnor plans 105 MW Concentrated Solar Power plant in Chile
The Camarones concentrated solar power (CSP) project consists in a solar power tower with a 220-kV grid connection, to be built with a total investment of USD 800 million (EUR 706.1m).
The Camarones concentrated solar power (CSP) project consists in a solar power tower with a 220-kV grid connection, to be built with a total investment of USD 800 million (EUR 706.1m).
The fund has a 36.95% stake in Aries Solar Thermal, which has two 50-megawatt concentrated solar thermal power (CSP) plants in Alcazar de San Juan ( Ciudad Real), and 33.83% of Dioxipe Solar.
In order to ensure the highest quality and to meet the performance requirements of the concentrated solar power plant, Elecnor looked for a reliable inspection, verification, testing and certification company.
With this transaction, Elecnor finalises financing for three thermal solar power projects which are currently being developed in Spain alongside the Eiser infrastructure fund and Aries engineering.
Solar Millennium Group has received order for licensing and engineering of parabolic trough collectors for two Spanish concentrated solar energy plants.