Tucson Electric Power and AREVA to speak at CSP Today USA in Las Vegas
AREVA Solar was the technology supplier for the 5 megawatt Concentrated Solar Power (CSP) booster on TEP’s H. Wilson Sundt Generating Station in Tucson.
AREVA Solar was the technology supplier for the 5 megawatt Concentrated Solar Power (CSP) booster on TEP’s H. Wilson Sundt Generating Station in Tucson.
TEP is partnering with Areva Solar on a concentrated solar thermal power in Tucson. Solar energy project to advance U.S. solar hybrid power plant market.
Arizona Public Service plans to increase its solar output more than sevenfold by 2013, with a massive, 280-MW concentrating solar thermal power plant, in the sun-soaked desert near Gila Bend.